Contractor Bid Exclusions and Allowances, Explained

Two bids can show very different totals for the same job because of two small words: exclusions and allowances. Understanding them is the fastest way to compare bids honestly.

What is an exclusion?

An exclusion is work the contractor is not including in the price. Common examples are permits, hauling debris, painting after repairs, or work behind walls that cannot be seen yet. If an item is excluded, it is either your responsibility or it will be priced later.

What is an allowance?

An allowance is a placeholder budget for something that has not been chosen yet, such as flooring, light fixtures or appliances. The contractor includes a dollar amount in the bid. If your final choice costs more than the allowance, you pay the difference.

Why they make bids hard to compare

A contractor with a low flooring allowance can show a lower total than a contractor with a realistic one, even though the finished job will cost about the same. The same goes for exclusions: the shorter the included list, the lower the number.

How to compare bids fairly

Common questions

Are exclusions a bad sign?
No. Every bid has them. The problem is when they are unwritten or when they cover work you assumed was included.
Who pays when an allowance runs out?
Usually the owner pays the difference between the allowance and the actual cost. Confirm this in the contract.

Put every bid in one place

Bidmetrics is free for owners and property managers. Post a job once, every contractor bids on the same scope, and you compare the bids against the project average with each contractor's track record and your own private notes.

More guides

General information, not legal or financial advice. Rules about licensing, insurance and bidding vary by state and by property. Bidmetrics does not verify contractor licenses or insurance.